Deliver ยท Project Management

Twelve stages. Sold to Closed. Nothing skipped.

Project Management runs every retrofit job down the same rail, from Sold to Closed. Each stage has its own gate, its own media, and its own handoff, so the coordinator sees what needs her today and the homeowner sees what is next.

Today's focus

Coordinator ยท Tue ยท sample data

3 open
  • Crew signoff on measure packet

    PROJ-2026-3841Alvarez residenceToday
  • Confirm install crew of 3 for tomorrow

    Open job
    PROJ-2026-3838Ellis residenceToday
  • Send change order for signature

    PROJ-2026-3833Park residenceThis week

PROJ-2026-3838

Ellis residence ยท $18,400

Install scheduled ยท 8 of 12

Install

Wed 7:30

Crew

3 assigned

Deposit

Cleared

The twelve-stage rail

One job, every stage in order. The rail is the same for every retrofit project, so the whole shop reads it the same way.

PROJ-2026-3838

Ellis residence ยท $18,400 ยท Retrofit ยท sample job

Stage: Install scheduled
01Sold
02Measure scheduled
03Measured
04Ordered
05Acknowledged
06In production
07Received
08Install scheduled
09Installed
10Punch list
11Final signoff
12Closed

What the system handled on its own

  • DONE

    Quote converted โ†’ Project created

    One atomic step. The order rollups, the deposit gate, and the measure task came into existence together.

  • DONE

    Deposit paid โ†’ Gate cleared

    The homeowner paid from the portal and the deposit gate cleared itself. Nobody checked a bank statement.

  • DONE

    Measured โ†’ Crew signoff on device

    Measure packet completed in the field, cut-sheet takeoff attached, crew signed off on the tablet.

  • DONE

    Received โ†’ Homeowner notified

    Product checked in, portal updated, install-scheduling text sent.

  • IN PROGRESS

    Install scheduled โ†’ Reminders running

    Crew assigned, homeowner reminder sequence started for the day before.

  • QUEUED

    Installed โ†’ Punch list, signoff, closeout

    Final signoff, rescission window, and closeout run the moment the install is marked done.

The coordinator

Today's focus, tomorrow's tasks, and the job behind each one

The day view is where the coordinator starts. It lists what needs her today and what is coming tomorrow, and any task opens straight into the job it belongs to. No hunting through a board to find the context.

  • Deposit gate clears automatically when the homeowner pays
  • Measure, acknowledgement, and receiving tasks raise themselves in order
  • Change orders wait for a signature, then apply in one step
Day viewCoordinator

Today's focus

  • 8:00Measure ยท Alvarez residence ยท crew signoff pendingOpen PROJ-2026-3841
  • 10:30Deposit gate cleared ยท Ellis residenceOpen PROJ-2026-3838
  • 1:00Acknowledgement received ยท Nguyen order 44-1187Open PROJ-2026-3829

Tomorrow's tasks

  • 7:30Install ยท Ellis residence ยท crew of 3Open PROJ-2026-3838
  • 2:00Change order awaiting signature ยท Park residenceOpen PROJ-2026-3833

The operating system for the whole job

Not a checklist someone has to remember. A system with a record of every measurement, photo, note, and signature.

Atomic conversion from quote to project

A signed quote becomes a project in one step, with order rollups built from the quote lines. Nothing is half-created and nothing has to be re-keyed.

Measure packet with a canonical schema

Every measure captures the same fields the same way. Cut-sheet takeoff comes out of it, and the crew signs off on a device before they leave the driveway.

Change orders and cancellation, done properly

A change order has a full lifecycle, from proposed to signed to applied. Cancellation is atomic, so a cancelled job never leaves orphaned orders or tasks behind.

One immutable media library

Measure photos, opening photos, note attachments, and documents all land in the jobโ€™s media library. Video uploads resume if the connection drops on site.

Field voice notes, transcribed

An installer talks into the phone at the opening. The note is transcribed automatically and attached to the job, searchable by the office the same afternoon.

Closeout and rescission handling

Punch list, final signoff, and the rescission window are stages, not sticky notes. A job is Closed only when the system says every gate has cleared.

Watch a job run itself

In a 20-minute demo we will walk a project from Sold to Closed and show every gate and handoff along the rail.